Framing is underway in this new accessory structure, with the wall and roof framing taking shape. The plywood shethed walls and rafters are up, showing solid progress on the build. Alongside the active framing, our crew keeps the site organized- offcuts, scrap lumber, and construction debris are staged in a designated pile for haul off, keeping the work area safe and clear for the team. A stack of reusable lumber is set aside seperately.
Complete haul-away after a roofing and interior job demo that included mainly old shingles, drywall, and insulation loaded straight into our dump trailer and hauled off-site. This job took 1.5 trailer loads and totaled 7 tons of debris removed, keeping the property clear and job-ready.
This video documents a complete trailer load-out, from initial loading through final debris removal using excavator equipment. It highlights our process for handling bulk waste, construction debris, and job-site cleanup with speed and precision- from full trailer to fully cleared in one continuous job.